Specialists in residential & commercial wet leisure products
Nationwide Service 01494 484 888
Commercial
Domestic

Hydrotherapy Plunge Pools

Start Date: Oct 2010 | Completion Date: Feb 2011

Bespoke Hydrotherapy plunge pools built for the exclusive use of TeamGB during the 2012 Olympics to aid the rapid recovery of muscle injury through cold and hot heat experiences.

The Lee Valley Athletics centre project has two state of the art hydrotherapy pools, one hot pool running at 38degC and one cold pool running at 10deg C. In conjunction with the on-site physiotherapy team this facility gave TeamGB the best possible recovery system.

Unique design and build by Edge Leisure including air handling, full disabled access and state of art control systems.

Edge Leisure built this system to suit the client’s requirements and brief.

 

Project Start

Hydrotherapy Plunge Pools before work commenced

Specifications

  • Bespoke design
  • State of the art equipment
  • Therapy use
  • Hot Pool – 38 Degrees C
  • Cold Pool – 10 Degrees C
  • Fully Automated
  • Air Handling
Speak To The Team!

Speak to a member of our team

Contact us today

Back to all current projects