School Refurbishment Project

Start Date: August 2018

Completion Date: Feb 2019

A full and comprehensive refurbishment of a 1930’s concrete painted swimming pool with a very limited filtration system.

The swimming pool shell was repaired then fitted with a bespoke on-site lining installed with racing lines for competitions.

The surround was fully replaced including a new substructure with bespoke copings, the pool had LED lighting installed along with a safety handrail to give children confidence when in the pool.

The filtration system was upgraded with all new fittings and pipework.

Access to site was very limited so Edge Leisure had a scaffold platform for materials and access onto the road.

Edge Leisure designed a new filtration system with a new plantroom and high grade condensing boilers and water saving devices for longevity.

We also replaced all the fencing around the pool area, our team are truly multiskilled!