Commerical Gym Project

Start Date: October 2020

Completion Date: Decmember 2021

This 1902 historic church building was converted into a high class gym and wellness facility installed by Edge Leisure.

Edge Leisure built a fully bespoke overflow pool with an integral hydropool, long bench with massage jets and internal entry/exit steps.

A very challenging project as the pool was built in the basement with limited access.

Also installed was a bespoke experience shower giving bathers a wealth of experiences including cold rain, tropical warm and thunderstorm spray.

Along with installation of a marble steam room and traditional wood sauna.

  • Overflow Swimming Pool
  • Sauna Cabin
  • Steam Room
  • Overflow HydroPool
  • Experience Shower
  • Air Handing unit with ducting